Daily tailings sample

DEMO-BONANZA-13

Bonanza Creek Mine · Day shift · 2026-07-13

Estimated gold loss0.160 g/h
Tailings sampled20.00 kg
Gold measured0.040 mg
Tailings grade0.002 mg/kg
Plant rate80.5 t/h

Manual record

No pan photo is linked to this sample.

The gold weight was entered manually. Upload future samples through the daily photo workflow to enable particle review and ML labeling.

Upload a daily pan sample

Field notes

[DEMO] Steady recovery; routine daily check